Project Monitoring

During the development process Project Monitoring is an essential part of an Asset Manager’s role. The Asset Manager acts as Employer's Agent to instruct the development team, to coordinate inputs and ensure the building is optimised for operation.

"We are a cradle to grave specialist in all living: From finding land through Virgin Land by Ringley to getting living sector assets built. Part of Asset Management is 'Project Monitoring' the part where we keep the developer honest and coordinate the project team."

We apply fresh thinking to each project challenge and have advised on the build of tens of thousands of units; with 25+ years’ experience in operating thousands of homes we have acute experience of operational durability and operational risk as well as how and where to spend the money to appeal to the relevant demographic for each development. Our role is to de-risk your build and prepare the development for operations.

An integral part of Project Monitoring is to work through the ESG Toolkit, to select the right benchmarking tools and accreditations and to design the building for, and ultimately to achieve the relevant benchmark of excellence.

Whilst we own a vertically integrated living sectors platform, the potential for OpEx efficiencies and to enhance the blended IRR starts with durability of fixtures and fittings, design, building flow and everything from access to lighting strategies.


As Asset Manager we partner with Clients throughout the development life cycle: land origination, alongside development management, through the project monitoring to stay ahead of trends, to keep the developer honest, look for construction efficiencies, and durable materials and equipment for units, amenity areas and back of house. Behind this sits our expertise to draft transport plans, operational management plans and landscape management plans to discharge S106 planning obligations. Our decades of operational expertise means that at all times we are focussed on building out customer journeys through the building and desirable homes that can be managed through Una Living, our tech-enabled living sectors delivery platform.

Decades of hands-on project monitoring experience adds value:
The components of Project Monitoring:
  • Draw up a briefing notes

    Draw up a briefing note to scope services for the relevant project development stage.

  • Select Consultants

    Inviting cost proposals from the: architect, quantity surveyor, mechanical & electrical design consultant, structural engineer, principle designer, interior designer, principle contractor, main contractor, structural engineer, building information management consultant, geotechnical engineer, planning consultant, site contract manager, specialist material supplier/manufacturer, scaffolding design engineer, approved inspector, leisure/gym/well-being providers, space/light consultants.

  • Shortlist Consultants

    Interview and shortlist consultants for each function; evaluate options and make recommendations.

  • Review terms of appointment

    Review terms of the each appointment to ensure the Property Owner he right to contractually request variations and extras.

  • Agree reporting procedures

    Agree meeting, reporting and recording procedures with consultants and relevant contractors. Manage communications, minute meetings and ensure information is appropriately distributed.

  • Bring forward decisons to meet milestones

    Key milestones will include: development concept, design, unit mix, unit layouts, unit appliances, unit fittings, unit small power, M&E, spec, value engineering, spares lists, defects protocols, fire strategy, lighting strategy, comms strategy, servicing strategy, sustainably sourced materials, deliveries/loading strategy, refuse strategy, window/facade cleaning strategy, roof access strategy, landscaping grounds/outdoor space strategy, secure by design, SLA's, materials selection, front and back of house design, and to further the zero carbon agenda.

  • Oversee the Build Contract

    Review of the monthly Employers' Architect's monthly site inspection reports prior to PC "Practical Completion", and then the pre-completion report. Inspect the site regularly and monitor the compliance of the developer with the terms of the contract. Seek approval to any variations, notify any contractual disputes.

  • Track closing out Planning Obligations

    Ensure the Project Architect tracks S106 obligations, and submits inputs from the project team.

  • Sign off management strategies

    Procure plans for management, landscaping, servicing, deliveries, CCTV, parking and the like.  Advise on units and communal areas heating strategy, utilities, comms & wi-fi; advise on ventilation and heat recovery strategies, secure by design principles in respect of: access, smart locks, CCTV, security, and entry phone systems; advise on façade cleaning and maintenance strategy: cradles, abseiling, hoists etc...

  • Due diligence on equipment suppliers 

    Input into the selection of plant and equipment such as lifts, heating systems, air-conditioning favouring open protocol systems, known performance and origin for sourcing spares.

  • Further the ESG Agenda

    Arrange accreditations to further the ESG journey including carbon credits to achieve operational net zero, BREEAM in-use certification, EV charging spaces, bike hire, sustainable materials in furnishing strategy, bulk supply of green energy, monitoring technology to supplement smart meters, photovoltaic panels on roof.

  • Advise on smart tech

    Advise on smart homes tech strategy: product design, offering, leak detection, smart locker/smart parcel room....

  • Front & Back of House

    Ideation, selection and briefing of interior designer including art curation: briefing, procurement; arrange and oversee installation of suitable signage and way finding.

  • Snagging and Handover

    Recript the regime for quality acceptance of each unit and the common parts including snagging and defect remedy processes.  Take recript of all guarantees and the manufacturer's instructions at handover.  Receive 'as built drawings' and 'layout and stacking drawings', attend cause and effect testing of key plant and the fire strategy, procure the fire risk assessment in preparation for first occupations.  Receipt O&M Manuals and CDM files.

  • Prepare for launch

    Procure the hoardings or wraps:  brief local community engagement, creative agencies, design.and installation.

  • Prepare for mobilisation

    Attend the commissioning, handover of major installed plant and equipment.  Ensure statutory documentation, including health and safety files, NHBC, Premier or other guarantee, operating manuals as required are in place.  Obtain confirmation of building regulations sign off; ensure performance bond or PCG and NHBC insolvency cover in place.  Obtain confirmation of collateral warranties.

  • Manage budgetary control

    Support the Property Owner by inputting into Royal Institute of British Architects ("RIBA") Stage A, B and C budgets.  Receive and check all invoices from the Employers Architect and the developer; report to the Property Owner on the progress of the development.

  • Prepare for stabilised asset management 

    Procure the creation of the asset register, planned property maintenance Gantt chart and advise on the scope of maintenance required to meet best practice standards.

  • Prepare for lease up

    Arrange and oversee fit out of the show homes; source furniture packs: briefing, selection, delivery, procurement, installation including window dressings.

  • Receipt unit compliance documents

    Coordinate data from the project teams data rooms to enable units compliance mobilisation including:  energy performance certificates, gas safe certificates, electrical ECIR reports, layout plans; arrange for the registration of properties which constitute a house in multiple occupation with the Local Authority and obtain relevant licences. Commission professional photography, videography, and/or drone surveys for marketing.

  • Prepare for occupations

    Arrange the registration of units with the postal service and the Local Authority for council tax; provide servicing strategies to the fire service, refuse service.  Procure production of a home user guide for residential units.

  • End of Defect stage

    Advise on the release of retention funds or bond. Resolve any latent defects issues, advise on the Final Account sign off.

The components of Project Monitoring:
  • Draw up a briefing notes

    Draw up a briefing note to scope services for the relevant project development stage.

  • Select Consultants

    Inviting cost proposals from the: architect, quantity surveyor, mechanical & electrical design consultant, structural engineer, principle designer, interior designer, principle contractor, main contractor, structural engineer, building information management consultant, geotechnical engineer, planning consultant, site contract manager, specialist material supplier/manufacturer, scaffolding design engineer, approved inspector, leisure/gym/well-being providers, space/light consultants.

  • Shortlist Consultants

    Interview and shortlist consultants for each function; evaluate options and make recommendations.

  • Review terms of appointment

    Review terms of the each appointment to ensure the Property Owner he right to contractually request variations and extras.

  • Agree reporting procedures

    Agree meeting, reporting and recording procedures with consultants and relevant contractors. Manage communications, minute meetings and ensure information is appropriately distributed.

  • Bring forward decisons to meet milestones

    Key milestones will include: development concept, design, unit mix, unit layouts, unit appliances, unit fittings, unit small power, M&E, spec, value engineering, spares lists, defects protocols, fire strategy, lighting strategy, comms strategy, servicing strategy, sustainably sourced materials, deliveries/loading strategy, refuse strategy, window/facade cleaning strategy, roof access strategy, landscaping grounds/outdoor space strategy, secure by design, SLA's, materials selection, front and back of house design, and to further the zero carbon agenda.

  • Oversee the Build Contract

    Review of the monthly Employers' Architect's monthly site inspection reports prior to PC "Practical Completion", and then the pre-completion report. Inspect the site regularly and monitor the compliance of the developer with the terms of the contract. Seek approval to any variations, notify any contractual disputes.

  • Track closing out Planning Obligations

    Ensure the Project Architect tracks S106 obligations, and submits inputs from the project team.

  • Sign off management strategies

    Procure plans for management, landscaping, servicing, deliveries, CCTV, parking and the like.  Advise on units and communal areas heating strategy, utilities, comms & wi-fi; advise on ventilation and heat recovery strategies, secure by design principles in respect of: access, smart locks, CCTV, security, and entry phone systems; advise on façade cleaning and maintenance strategy: cradles, abseiling, hoists etc...

  • Due diligence on equipment suppliers 

    Input into the selection of plant and equipment such as lifts, heating systems, air-conditioning favouring open protocol systems, known performance and origin for sourcing spares.

  • Further the ESG Agenda

    Arrange accreditations to further the ESG journey including carbon credits to achieve operational net zero, BREEAM in-use certification, EV charging spaces, bike hire, sustainable materials in furnishing strategy, bulk supply of green energy, monitoring technology to supplement smart meters, photovoltaic panels on roof.

  • Advise on smart tech

    Advise on smart homes tech strategy: product design, offering, leak detection, smart locker/smart parcel room....

  • Front & Back of House

    Ideation, selection and briefing of interior designer including art curation: briefing, procurement; arrange and oversee installation of suitable signage and way finding.

  • Snagging and Handover

    Recript the regime for quality acceptance of each unit and the common parts including snagging and defect remedy processes.  Take recript of all guarantees and the manufacturer's instructions at handover.  Receive 'as built drawings' and 'layout and stacking drawings', attend cause and effect testing of key plant and the fire strategy, procure the fire risk assessment in preparation for first occupations.  Receipt O&M Manuals and CDM files.

  • Prepare for launch

    Procure the hoardings or wraps:  brief local community engagement, creative agencies, design.and installation.

  • Prepare for mobilisation

    Attend the commissioning, handover of major installed plant and equipment.  Ensure statutory documentation, including health and safety files, NHBC, Premier or other guarantee, operating manuals as required are in place.  Obtain confirmation of building regulations sign off; ensure performance bond or PCG and NHBC insolvency cover in place.  Obtain confirmation of collateral warranties.

  • Manage budgetary control

    Support the Property Owner by inputting into Royal Institute of British Architects ("RIBA") Stage A, B and C budgets.  Receive and check all invoices from the Employers Architect and the developer; report to the Property Owner on the progress of the development.

  • Prepare for stabilised asset management 

    Procure the creation of the asset register, planned property maintenance Gantt chart and advise on the scope of maintenance required to meet best practice standards.

  • Prepare for lease up

    Arrange and oversee fit out of the show homes; source furniture packs: briefing, selection, delivery, procurement, installation including window dressings.

  • Receipt unit compliance documents

    Coordinate data from the project teams data rooms to enable units compliance mobilisation including:  energy performance certificates, gas safe certificates, electrical ECIR reports, layout plans; arrange for the registration of properties which constitute a house in multiple occupation with the Local Authority and obtain relevant licences. Commission professional photography, videography, and/or drone surveys for marketing.

  • Prepare for occupations

    Arrange the registration of units with the postal service and the Local Authority for council tax; provide servicing strategies to the fire service, refuse service.  Procure production of a home user guide for residential units.

  • End of Defect stage

    Advise on the release of retention funds or bond. Resolve any latent defects issues, advise on the Final Account sign off.

       
       
       






Articles & Blogs related:


Mary-Anne Bowring
Chief Executive Officer
Andrew Pratt
Director
Leana Aristodemou
Head of Reporting
Oliver Hopkins
Investment Director
Libby Chen
FM / Compliance Manager
Rob Pratt
MD - BTR London

Una Living is the living sectors delivery platform of The Ringley Group.

We build communities and support thousands of residents nationally.

Check out Una Living